Jetwash were awarded a contract in October 2012 for the construction of a finishing facility to accommodate 1500 pigs. The project involved a full turnkey development, comprising baseworks, steel fabrication and erection of the main structure and full onsite installation and completion of the facility in-line with the specification as detailed below.

  • External Roofing – GRP Roof Sheeting
  • Roof Insulation – Fibreglass (Thickness 50mm / 1 mtr wide sheets / Jointed with a PVC H-Profile)
  • Walling – Bonded GRP Insulated Panels – high impact GRP White Gloss interior finish
  • PVC Windows – Flanged (1200 x 500mm)
  • Flooring – Concrete Slats (18mm Spacing / Machine Finished)
  • FC14 Climate Control Regulation System
  • Penning System – Stainless Steel Fabrication to accommodate easy clean PVC division gables and walls (Thickness 50mm / Height 1000mm)
  • Feeding – Installation of Flexi Auger Feed Transport System and TOP FEEDER 740 fattening feeders (PVC Hoppers – 120 Kg Capacity)